China Communications Construction 中国交通建设股份有限公司 China National Real Estate Development Group is a sister company of China Communications Construction Co., Ltd., which was both owned by China Communications Construction Group Corp., a state-owned enterprise that was supervised by the State-owned Assets Supervision and Administration Commission of the State Council.The company was established in mainland China in 2005 from the merger of China Harbour Engineering Company Group and China Road and Bridge Group.The company is engaged in the construction and design of transportation infrastructure dredging and port machinery manufacturing business.It is the largest port construction and Design Company in China, the largest dredging company in China and the third largest in the world.It now holds an additional subsidiary, Shanghai Zhenhua Heavy Industries Company(ZPMC)(Chinese: 上海振华重工(集团)股份有限公司).In April 2015, the Australia Government approved the sale of Leighton Holding"s John Holland Group, one the country"s biggest construction firms, to China Communications Construction Company(CCCC)for A$1.15bn(¥5.46bn;$879m).As of June 2015, China Communications Construction Company ranks 4th amongst Chinese companies for intangible assets.Recruitment process and orientation
For the recruitment process, my classmate and I personally approached the company branch in Guangzhou.It was my country consulate office who recommended me this company.This company helps us enormously to not only accept our internship application but also assign us good location as to avoid transportation and economic difficulties.The duration of the internship was for 20 days.1.实习目的 本项目为顺德高新区西部启动区一期,开发范围包括智域城和高端产业片区,具体范围西至杏坛镇二环路,东至容桂水道,北至一更涌,南至东海大涌。开发范围面积约 9.5平方公里,其中建设项目有市政道路及附属工程、河涌水利工程、中压配电工程和公共设施配套工程等等。
2.实习时间 2016 年 8 月 1 日 – 2016 年 8 月 20 日 3.实习地点
广东省佛山市顺德区位于珠江三角洲中部,北邻广州,靠近香港、澳门。顺德区面积 806平方公里,常住人口 249.34 万人,2014 年全区国内生产总值 2783 亿元,地方财政公共预算收入 173.9 亿元。
顺德高新区西部启动区(以下简称“启动区”),为省级高新技术产业开发区,位于顺德区杏坛镇东部,西至江珠高速公路,东至容桂水道,北至顺德支流,南至东海大涌,总面积约 18.86平方公里。
4.总承包工作范围 总承包工作包括施工图设计的所有工程项目和内容。承包商负责在遵守中国政府的各项法律、法规以及项目公司各项管理要求的前提下,安全、及时地完成合同约定的建设方案。承包商的工作包括但不限于为成功建设此项目所需的项目管理中所涉及到的工程设计、施工直至交工验收;本项目的 EPC 工作内容如下:
1.工程部分的初步设计和施工图设计; 2.满足施工图设计及规范要求的工程地质勘察;
3.本项目逐步完成整个工程验收,按规定提交全部竣工资料(包括竣工图); 5.工程内容 本项目的主要内容包括:
1.组织完成土地达到出让条件所必需的配套工程,包括但不限于以下工程的勘察、设计、采购、施工等工作:
2.市政道路及附属工程:包括市政道路、跨河涌桥涵;相关的附属工程包括给水、雨污排水、道路照明、交通设施、绿化、电力管沟等; 3.河涌水利工程:包括排水河涌、调蓄湖; 4.中压配电工程(如 10KV 线路综合建设改造,10KV 线路、电缆通道,基础设施施工和企业项目建设过程的临时用电工程,及 110KV 电缆沟); 5.公共设施配套工程。
Project management If one word could describe the essence of the project management, it is responsibility.The project manager is responsible for all activities in the project.This does not mean the project manager do everything associated with the project;it does means the project manager own ultimate responsibility for the project, regardless who is on the project team and obstacle encountered along the way to successful completion.The technical knowledge and skill required to be a successful project manager are wide Ranging.In fact, you don’t need to be an expert in all of them, you do, however, need to have Engineering experience, technical experience, and, will and commitment to take on the overall responsibility for your projects.The project manager’s responsibility is to manage the financial, technical and schedule on time, within budget and with a technical quality that meets or exceeds the contractual performance and specification.Major Duty I was assigned My duty was Site work and Administrative Work Site work :-Managing construction activities at project site.:-Inspecting construction site to monitor progress and ensure conformance to engineering plans, specifications, and construction standards.:-Overseeing the work and making sure it runs smoothing and plan.:-Inspecting construction site to monitor progress and ensure conformance to engineering plans, specifications, and construction standards Administrative Work
:-Check design and auditing drawing Through my internship duration in the company, I would like to thank my supervisors for their kind help guiding and giving orientation in each activity before I start practicing the main activities.Without help of my supervisor, I wouldn’t have achieve the knowledge and Experiences I have gained now.Our supervisor helps us by;1.Guiding and giving orientation in each activity.2.Brief description of what will be done in each activity.3.Reacting politely to our questions.The activity performed daily-Clay material placing-Compaction-Excavation of soft material-Material mix-Excavation of hard core-Waste away
Some pictures I took from the construction site